To the central content area

The Survey of the Soil and Groundwater Contamination in Chang-hua County in 2019

Absrtact
For the environmental sustainability, the program of “The Survey of Soil and Groundwater Contamination in Changhua county in 2019” has been advanced, which involves groundwater monitoring wells maintenance and groundwater investigation, unlisted farmland reexamine, potential polluting factory investigation, to supervise and verify pollution remediation of contaminated sites, dealing with emergency cases, and administrative assistances. The plan had been executed from January 1st 2019 to November 30th 2019, and the results of implementation are summarized as follows: At first, the task of groundwater monitoring wells inspection has been implemented twice this year and there were totally 10 maintenance works finished. All slug tests of groundwater monitoring wells were completed, and six purges and five foreign matter exclusion of monitoring well were implemented according to the slug test results. Besides, there were 7 monitoring wells surveys accomplished in both dry and wet season, and besides the monitoring wells of N00282, N00283 and N00490,the results TPH concentrations over than Groundwater Pollution Control Standards and the others are less than Groundwater Pollution Control Standards. There were 258 farmlands finished sampling for regular monitoring, and the analysis results showed 10 farmlands exceeded Soil Pollution Control Standards. In addition, the work team explored 30 factories with pollution potential in Changhua County. According to the exploration, there were 12 plants chosen and sampled, and the results demonstrated 1 factory’s soil samples over the monitor standards and 3 factories’ soil samples over the control standards. With respect to the mission of to supervise and verify pollution remediation of polluted sites, those sites had been examined at least bimonthly, and there were 31 listed sites completed verification and 6 sites sampled for regular monitoring. There were entirely 7 emergency cases implemented during plan period.
Keyword
Potential polluting factory investigation, Maintenance of monitoring well, farmland sites sampled for regular monitoring
Open
top